Everything your Oracle estate needs on OCI. And a fixed-price way to get there.
From the first landing zone to 24x7 managed operations, TECH ECS covers the full OCI lifecycle. And when you are ready to move Oracle EBS, ForgeL&S does it as one fixed-scope, fixed-price project.
Talk to our OCI team →Stabilise first. Optimize always. Transform when you are ready.
Most partners implement and leave. We build the foundation, run it around the clock, and modernise it when the business is ready. Start at any point in that journey, on an estate built by anyone, and we cover the rest as you need it.
The full OCI lifecycle, under one team.
Nine capability areas spanning foundations, data, applications and day-to-day operations. You do not have to take all of it. Start where the pressure is.
OCI Landing Zones
Environment structure, networking, access control, compute and storage, set up right the first time so it passes review.
Security & Governance
Zero-Trust design with IAM, Cloud Guard, Vault, Security Zones and Data Safe, aligned to your regulatory baseline.
Database Platform
Autonomous and Exadata platforms, migration, performance tuning and high availability across your Oracle estate.
Resilience & Recovery
Cross-region disaster recovery, Data Guard, backup strategy and a tested failover drill with your team.
Application Modernization
Legacy Forms and Java rebuilt with APEX and Visual Builder, WebLogic workloads moved into containers.
Integration & APIs
Oracle and non-Oracle systems connected through Integration Cloud, API Gateway, B2B and process automation.
Data, Analytics & AI
Enterprise data lakes, executive dashboards on Analytics Cloud, forecasting and generative AI where it earns its place.
24x7 Managed Services
Round-the-clock monitoring, patching and incident response, with active FinOps keeping cloud spend predictable.
Migration Assessment
Workload sizing, right-sizing recommendations and a multi-year cost picture before you commit to anything.
How close the team sits is your call.
Your workloads stay in your in-region OCI tenancy throughout. Where the team sits is a separate decision, and it is entirely yours.
At your location
Embedded with your team for design, cutover and hypercare.
Middle East
Delivered from our regional hub, close to your business hours.
India
From our delivery centres, for depth of bench at scale.
A secured blend
Mixed to suit the workload, the timeline and the sensitivity.
Your EBS does not need rebuilding. It needs somewhere better to run.
Your EBS works. The hardware underneath it is the problem, ageing and due for a refresh nobody wants to fund again. ForgeL&S moves the whole thing to OCI as it stands, with one team from first assessment through to go-live.
Landing zone included
The OCI environment build is part of the project, not a separate line item you discover later.
One team, end to end
The same people assess, build, migrate and cut over. You are not handing off between vendors halfway through.
Fixed scope, fixed price
A one-time project priced on your setup. What is in and what is out is written down before we start.
Database and application
Both sides move together, sized and configured to match how your estate runs today.
Minimal, planned downtime
We aim for the shortest realistic cutover window, confirmed once we have assessed your environment.
You sign off before go-live
One coordinated round of UAT with your team. Production is not touched until you are satisfied.
Sized to the EBS estate you actually run.
Which path applies is decided by how your EBS runs today, not something you pick. Both cover the OCI landing zone build plus the migration of your database and application, across one UAT and one Production environment.
Single-Node Migration
For standard EBS estates running application and database on a single server.
- OCI landing zone build, included
- EBS application migration
- Database migration, non-clustered
- 1 UAT and 1 Production environment
- DNS cutover coordinated with your team
Multi-Node Migration
For clustered, multi-server EBS environments with a distributed footprint.
- OCI landing zone build, included
- EBS application migration, multi-node
- Database migration, clustered setup
- 1 UAT and 1 Production environment
- DNS cutover coordinated with your team
Five stages. Nothing improvised.
Assess
A full picture of your current setup: database type, server count, public-facing components, customizations and integrations.
Build
Stand up the OCI landing zone, then configure the migration tooling around your environment.
Migrate
Move in stages, database first and then application, testing at each step rather than at the end.
UAT
One coordinated round of testing with your business and functional teams. Production waits for your sign-off.
Cutover
Go live, switch DNS across, then validate that every module is behaving as it should.
What you get, and what sits outside the project.
Fixed price only works if the boundary is clear. Here is both sides of it before you start, not after.
What you get
- A provisioned OCI landing zone, ready for your workloads
- Your EBS environment up and running on OCI
- A step-by-step migration runbook
- A rollback plan, in case it is ever needed
- A sign-off checklist confirming your team accepted UAT
- A post-go-live validation report across your EBS modules
What sits outside
- Upgrading or patching EBS to an OCI-compatible version
- Running test scripts and validating business processes
- Retesting custom code and RICE objects
- Changes on your network: VPN, FastConnect, ports, firewall rules
- Additional rounds of testing beyond the first
- Full workload sizing and cost assessment, available separately
The details, up front.
Does this include upgrading our EBS version?
No. ForgeL&S moves your environment as it stands and assumes your current EBS version already runs on OCI. If an upgrade or patch is needed first, that is separate work, scoped and priced on its own.
How much downtime should we expect?
Minimal, planned downtime. We aim for the shortest realistic cutover window for your setup, and confirm the actual window once we have assessed your environment.
Is the OCI landing zone an extra cost?
No. Building the landing zone, including environment structure, networking, access management, compute and storage, is part of the project rather than a separate engagement.
Who runs the testing?
We coordinate and support one round of UAT with your team. Running the test scripts, validating business processes and fixing anything that surfaces stays with your functional team.
What do you need from our network team?
We will tell you exactly what is required to connect to OCI, whether that is VPN or FastConnect, open ports or firewall rules. The changes themselves are made by your network team.
Can you size our estate before we commit?
Yes. Our On-Prem to OCI Migration Assessment covers workload sizing and the multi-year cost picture. It is a separate engagement, and useful if you want detail before committing to the migration.
Do you only work on systems you implemented?
No. We specialise in stepping into environments built by anyone, to stabilise, optimise and move them forward.
Tell us what you are running today.
Share a few details and our team will reach out to talk through your Oracle estate, and where a move to OCI would actually pay off.
